This project requires modification of
NAC (Design Studio 4). Some alterations to existing design has been made in terms of construction systems which is to be replaced with a different, more appropriate, more complex and/or more recent building technologies without affecting the designs entirely. Ultimately, the drawings are collated into a report that documents both the predecent studies and the detailed drawings of the design.
Modifications are carried out on the following building components :
- Floor system
- Wall system
- Roof system
- To include a new basement level into existing design
No comments:
Post a Comment